Fallowfield HMO     

Dormer Conversions

Two side by side 2 bedroom properties owned by the same client, converted each into 6 bed HMO investment properties with three bathrooms each.

Location: Fallowfield, M14

​

Duration: 12 weeks for both properties

​

Scope: Timber frame, slate, steel, woodwork, cladding, carpet flooring, tiling, electrics, new plumbing.

Hale Loft Conversion

Full rip out, lowered ceilings and dormer conversion with new roof and en-suite.

Location: Hale Barnes, M23

​

Duration: 10 Weeks

​

Scope: Timber Frame, steelwork, timber laminate flooring, tiling, electrics, new plumbing.

Knutsford Loft Conversion

3 bedroom Family home extended to create a dormer with 4th bedroom and en-suite.

Location: Knutsford, Cheshire, WA16

​

Duration: 10 weeks

​

Scope: Steelwork, timber frame, uPVC cladding, uPVC windows and velux windows.