Dormer Conversions

Fallowfield HMO     

Dormer Conversions

Two side by side 2 bedroom properties owned by the same client, converted each into 6 bed HMO investment properties with three bathrooms each.

Location: Fallowfield, M14

Duration: 12 weeks for both properties

Scope: Timber frame, slate, steel, woodwork, cladding, carpet flooring, tiling, electrics, new plumbing.

Hale Loft Conversion

Full rip out, lowered ceilings and dormer conversion with new roof and en-suite.

Location: Hale Barnes, M23

Duration: 10 Weeks

Scope: Timber Frame, steelwork, timber laminate flooring, tiling, electrics, new plumbing.

Knutsford Loft Conversion

3 bedroom Family home extended to create a dormer with 4th bedroom and en-suite.

Location: Knutsford, Cheshire, WA16

Duration: 10 weeks

Scope: Steelwork, timber frame, uPVC cladding, uPVC windows and velux windows.

Stockport Road Dormer
Large development with side and rear extension, dormer conversion, internal reconfiguration and rear garden office.

Location: Altrincham, WA14

Duration: 22 WEEKS

Scope: Groundworks, brick and blockwork, steelwork, bi-folding doors, tiling, dormer roofing, bathroom, electrics re-wiring, garden and landscaping, rear garden office and store.

Mobberly Dormer

3 bedroom Family home extended with dormer conversions.

Location: Mobberly, SK9

Duration: 6 weeks

Scope: Timber frame, slate, steel, woodwork.