FEATURED PROJECTS

Dormer Conversions

Fallowfield HMO     

Dormer Conversions

Two side by side 2 bedroom properties owned by the same client, converted each into 6 bed HMO investment properties with three bathrooms each.

Location: Fallowfield, M14

Duration: 12 weeks for both properties

Scope: Timber frame, slate, steel, woodwork, cladding, carpet flooring, tiling, electrics, new plumbing.

Hale Loft Conversion

Full rip out, lowered ceilings and dormer conversion with new roof and en-suite.

Location: Hale Barnes, M23

Duration: 10 Weeks

Scope: Timber Frame, steelwork, timber laminate flooring, tiling, electrics, new plumbing.

Knutsford Loft Conversion

3 bedroom Family home extended to create a dormer with 4th bedroom and en-suite.

Location: Knutsford, Cheshire, WA16

Duration: 10 weeks

Scope: Steelwork, timber frame, uPVC cladding, uPVC windows and velux windows.

Mobberly Dormer

3 bedroom Family home extended with dormer conversions.

Location: Mobberly, SK9

Duration: 6 weeks

Scope: Timber frame, slate, steel, woodwork.

Your Development Journey begins with Booking an Appointment

© 2020 by M Square Developments Ltd. All Rights Reserved.

Website design by

JLM Logo.png