Dormer Conversions
Fallowfield HMO
Dormer Conversions
Two side by side 2 bedroom properties owned by the same client, converted each into 6 bed HMO investment properties with three bathrooms each.
Location: Fallowfield, M14
Duration: 12 weeks for both properties
Scope: Timber frame, slate, steel, woodwork, cladding, carpet flooring, tiling, electrics, new plumbing.
Hale Loft Conversion
Full rip out, lowered ceilings and dormer conversion with new roof and en-suite.
Location: Hale Barnes, M23
Duration: 10 Weeks
Scope: Timber Frame, steelwork, timber laminate flooring, tiling, electrics, new plumbing.
Knutsford Loft Conversion
3 bedroom Family home extended to create a dormer with 4th bedroom and en-suite.
Location: Knutsford, Cheshire, WA16
Duration: 10 weeks
Scope: Steelwork, timber frame, uPVC cladding, uPVC windows and velux windows.
Stockport Road Dormer
Large development with side and rear extension, dormer conversion, internal reconfiguration and rear garden office.
Location: Altrincham, WA14
Duration: 22 WEEKS
Scope: Groundworks, brick and blockwork, steelwork, bi-folding doors, tiling, dormer roofing, bathroom, electrics re-wiring, garden and landscaping, rear garden office and store.
Mobberly Dormer
3 bedroom Family home extended with dormer conversions.
Location: Mobberly, SK9
Duration: 6 weeks
Scope: Timber frame, slate, steel, woodwork.