Renovations

Fallowfield HMO Renovation

Two side by side 2 bedroom properties owned by the same client, converted each into 6 bed HMO investment properties  with three bathrooms each.

Location: Fallowfield, M14

Duration: 12 weeks for both properties

Scope: Timber frame, slate, steel, woodwork, cladding, carpet flooring, tiling, electrics, new plumbing.

Stockport Road Extension
Large development with side and rear extension, dormer conversion, internal reconfiguration and rear garden office.

Location: Altrincham, WA14

Duration: 22 WEEKS

Scope: Groundworks, brick and blockwork, steelwork, bi-folding doors, tiling, dormer roofing, bathroom, electrics re-wiring, garden and landscaping, rear garden office and store.

Weldon Road Renovation

2 bedroom Family home extended to create 3 double bedrooms and a large bathroom. Full loft conversion by dropping ceilings. Re-plastered, full electrical re-wire and new boiler along with small knock through inside kitchen.

Location: Weldon Road, Altrincham, WA14

Duration: 12 weeks

Scope: Rip out and new ceilings, velux windows, new bathroom and kitchen.

Hale Renovation

Large development with front and double side extension. 

Location: Hale, WA13

Duration: 16 weeks

Scope: Brick and blockwork, steelwork, bifolding doors, engineered wood flooring, exterior rendering to match existing, exterior porch lighting.

Pickmere Renovation

4 bed family home that underwent several projects including a dormer, garage conversion and two bathrooms along with extensive electrical work and redecoration.

Location: Pickmere, CW9

Duration: 12 weeks

Scope: New openings, timber work, insulation, floors, electrics, stud work and decorations.

Didsbury Renovation

Large 6 bedroom family home with added floors and multiple extensions. 

Location: Didsbury, M20

Duration: 4 weeks

Scope: Stud work, plastering and joinery works.

Bowden Renovation

Large family home with roofing works, exterior rendering and groundworks. 

Location: Bowden, Cheshire, WA14

Duration: 4 weeks

Scope: Roofing works, rendering, joinery, new fencing, timber decking, groundworks.